Business Articles and Press Releases

Latest Articles

Articles 851 to 860 | Page 86 of 114

  • Euston Road, Camden, London

    Euston Road forms part of London’s Inner Ring Road, is the northern boundary of the Congestion Charge zone and one of the capital’s heaviest trafficked routes.

  • Dollar Bay, London Docklands

    Dollar Bay is a residential development of 115 apartments and penthouses in Canary Wharf, London.

  • Precast options for bad ground conditions

    When Peter Harding Construction began work on a project at St Wilfred’s Academy, Blackburn they were presented with bad ground conditions, which needed a drainage solution that would enable them complete the works with maximum efficiency whilst ensuring the health and safety of every member of their team. Having appraised the drainage drawings, the drainage design consultants designed orifice chambers and Hydro-Brake chambers within the surface water network using traditional systems. How

  • Largest circular precast weir wall chamber installed

    The CPM Group has supplied the UK’s largest circular precast weir wall chamber to the prestigious Erith Park development, as part of the £60m phase 2 programme of drainage and enabling works. Ground worker and civil contractor, O’Keefe Construction took delivery of the precast weir wall chamber in June after the off-site solution was made at CPM’s Pollington works in Yorkshire following their new production facility that was built last year.

Articles 851 to 860 | Page 86 of 114

Find a Business Article or Press Release...