Latest Articles
Articles 931 to 940 | Page 94 of 121
23 June 2017
-
What do we value? Our relationship with you and your relationship with your clients
Through our quality of service and professionalism, Darcey Quigley & Co has developed relationships with businesses of all sizes that has seen us work together time and time again since our formation in 2007.
22 June 2017
-
What Results Can Our Commercial Debt Recovery Achieve For Your Business?
Darcey Quigley & Co prides itself on delivering results for its clients, adding real value to the credit control departments of businesses of all sizes.
21 June 2017
-
Euston Road, Camden, London
Euston Road forms part of London’s Inner Ring Road, is the northern boundary of the Congestion Charge zone and one of the capital’s heaviest trafficked routes.
-
Dollar Bay, London Docklands
Dollar Bay is a residential development of 115 apartments and penthouses in Canary Wharf, London.
14 June 2017
-
Precast options for bad ground conditions
When Peter Harding Construction began work on a project at St Wilfred’s Academy, Blackburn they were presented with bad ground conditions, which needed a drainage solution that would enable them complete the works with maximum efficiency whilst ensuring the health and safety of every member of their team. Having appraised the drainage drawings, the drainage design consultants designed orifice chambers and Hydro-Brake chambers within the surface water network using traditional systems. How
13 June 2017
-
Largest circular precast weir wall chamber installed
The CPM Group has supplied the UK’s largest circular precast weir wall chamber to the prestigious Erith Park development, as part of the £60m phase 2 programme of drainage and enabling works. Ground worker and civil contractor, O’Keefe Construction took delivery of the precast weir wall chamber in June after the off-site solution was made at CPM’s Pollington works in Yorkshire following their new production facility that was built last year.
-
CPM Redi-Rock™ wall saves space for car parking
CPM has recently been involved with the completion of a retaining wall at the prestigious £42 million Fox Valley Retail Development in Sheffield, which was officially opened by Joanna Lumley OBE CPM manufactured and supplied the Pell Frischmann Consultants designed Redi-Rock™ modular wall for Henry Boot Construction at the former 28 acre Outokumpu Steelworks site, in Stocksbridge to enable room for 600 space car park at the new retail park.
-
Offsite solutions increase efficiencies onsite
CPM’s sealed manhole system has been used extensively by K&L Groundworks on their site in Felton, Northumberland for a housing development for Bellway Homes. So successful has the installation of CPM’s Perfect Manhole system been that the site were installing a complete manhole within 35 minutes, which is not only great news for safer construction on site, as there was no requirement to form a concrete surround but there was a reduction of open excavations increasing the Health and Safety on
-
CPM’s Redi-Rock™ walling gains quality award recognition
CPM’s Redi-Rock™ modular precast concrete blocks has received C E Marking, ensuring that the aesthetically pleasing walling, complies with the essential requirements of the European health, safety and environment protection legislation.
12 June 2017
-
Large Format Technical Drawing Scanning Project
The Design Department of a specialist aviation solutions company holds a large quantity of third party supplier technical drawings which are frequently accessed by engineering staff.
Articles 931 to 940 | Page 94 of 121