Business Articles and Press Releases

Latest Articles

Articles 1721 to 1730 | Page 173 of 287

  • Precast options for bad ground conditions

    When Peter Harding Construction began work on a project at St Wilfred’s Academy, Blackburn they were presented with bad ground conditions, which needed a drainage solution that would enable them complete the works with maximum efficiency whilst ensuring the health and safety of every member of their team. Having appraised the drainage drawings, the drainage design consultants designed orifice chambers and Hydro-Brake chambers within the surface water network using traditional systems. How

  • Largest circular precast weir wall chamber installed

    The CPM Group has supplied the UK’s largest circular precast weir wall chamber to the prestigious Erith Park development, as part of the £60m phase 2 programme of drainage and enabling works. Ground worker and civil contractor, O’Keefe Construction took delivery of the precast weir wall chamber in June after the off-site solution was made at CPM’s Pollington works in Yorkshire following their new production facility that was built last year.

  • CPM Redi-Rock™ wall saves space for car parking

    CPM has recently been involved with the completion of a retaining wall at the prestigious £42 million Fox Valley Retail Development in Sheffield, which was officially opened by Joanna Lumley OBE CPM manufactured and supplied the Pell Frischmann Consultants designed Redi-Rock™ modular wall for Henry Boot Construction at the former 28 acre Outokumpu Steelworks site, in Stocksbridge to enable room for 600 space car park at the new retail park.

  • Offsite solutions increase efficiencies onsite

    CPM’s sealed manhole system has been used extensively by K&L Groundworks on their site in Felton, Northumberland for a housing development for Bellway Homes. So successful has the installation of CPM’s Perfect Manhole system been that the site were installing a complete manhole within 35 minutes, which is not only great news for safer construction on site, as there was no requirement to form a concrete surround but there was a reduction of open excavations increasing the Health and Safety on

  • CPM’s Redi-Rock™ walling gains quality award recognition

    CPM’s Redi-Rock™ modular precast concrete blocks has received C E Marking, ensuring that the aesthetically pleasing walling, complies with the essential requirements of the European health, safety and environment protection legislation.

Articles 1721 to 1730 | Page 173 of 287

Find a Business Article or Press Release...