Latest Articles
Articles 2551 to 2560 | Page 256 of 305
17 May 2013
-
The Future of ANTI-LIGATURE Radiator Covers
Coverad first - truly Anti Ligature Radiator Cover! No welded mesh inserts! All Mesh is punched into the cover!
-
Bespoke Re-Locatable Equipment Buildings
Eldapoint manufacture bespoke Re-locatable Equipment Buildings (REB’s) all manufactured to the BR1615D Specification, Modular Equipment Buildings (MEH’s) Specialist Housing’s, Fire Certificated Units, Blast Resistant Units, Secure Steel Accommodation Units, Secure Stores, Changing Rooms, Toilets Blocks, Shower Blocks, Sleeper Units, Welfare Units and Modular Buildings.
16 May 2013
-
Spaciotempo’s temporary space helps Nissan’s LEAF to roll off the production line
Nissan has overcome a lack of space at its Sunderland plant by investing in a temporary building, which has allowed it to accommodate the production of its brand new electric LEAF.
-
Money and customer demands are named as the biggest challenges for the materials handling industry
Worries over finances and increasing customer demands are the biggest challenges facing the materials handling industry, according to visitors who took part in a survey carried out at this year’s IMHX exhibition, by temporary building supplier, Spaciotempo UK Ltd
09 May 2013
-
Swains Lane case study
Modernist glass house beside a cemetery
-
New House Park case study
Bringing light to an extension
-
Collins Theatre case study
A theatre on Islington Green
-
Chamonix case study
Beautiful former grand hotel in France
-
Bridge House Pub case study
Bishop Stortford's most popular night spot
-
Balancing Barn case study
World class architecture in rural Suffolk
Articles 2551 to 2560 | Page 256 of 305