Latest Articles
Articles 2681 to 2690 | Page 269 of 305
14 June 2012
-
Retail perfection thanks to Ultra Tile and Ultra Floor
Leading products from Ultra Tile and Ultra Floor helped to create retail perfection at Stafford Tiles and Flooring Solutions new premises.
-
New Arstyl® range from nmc
Decorate interior spaces freely in 3 dimensions on walls and ceilings with ARSTYL® products from NMC.
13 June 2012
-
Alimak Hek Serves Room for London
On the Southbank of the Thames Alimak Hek provide passenger lift access to this unique experience………
-
Life at Tower Hamlets Homes gets a lift from an AlimakHek Temporary Lift
Lift and Hoist specialist AlimakHek has recently installed two temporary lifts for Tower Hamlets Homes as part of a recent internal lift refurbishment project at Ansell House which avoided the need to re-accommodate any of the 250 residents during the 12 week refurbishment programme.
-
New Hendon village, London
A. Proctor Group recently supplied Profloor Levelling System to Countryside Properties’ recent developement at New Hendon Village, Colindale, London, NW9.
-
A trimmer leaner door with Floorwise
Saving time on-site when installing floorcoverings of all kinds, door trimmers have become a regular item in many installers’ toolboxes and Floorwise has introduced an updated DS 5000 Gulliver model that takes functionality and ease of use to the next level.
-
Centenary Landmark for the Turner Group
Turner Access is a member of the Turner Group of Companies and as such, will join forces with its sister companies to commemorate the Group centenary year during 2012.
-
The future of Aluminium Tower best practice is Integral Advance Guardrails
Advance Guardrails (AGR) are now becoming widely adopted as the safest solution in preventing the risk of fall from height during assembly, dismantle and alteration of temporary equipment.
-
Turner Access demonstrates how best practice in Access & Scaffolding is achieved
Turner Access exhibited at this year’s Safety & Health Expo, offering guidance on how to achieve best practice in access and scaffolding.
01 June 2012
-
Acrow Galvanizing Gets Fired Up
A galvanizing firm has played a helping hand in a project that has seen the production of vital air sampling units at one of the largest combined heat and power stations in the world.
Articles 2681 to 2690 | Page 269 of 305