Regenerator & Vessel Head Removal
Stockcode:
In 1998, Destec Engineering performed a world first when it commenced preliminary cutting to remove the Regenerator Head at the Coryton Refinery, UK – 25 days in advance of day 1 of the planned turnaround start date, allowing the head to be lifted on mechanical day 2.
Cutting of both the vessel shell and internal refractory was carried out dry, from the outside. and included all necessary weld preparation ready for reinstatement of the head.
The dry cutting operation is carried out using portable milling or grinding equipment running on two circumferential, parallel rails, fixed either side of the cut line. The method is relatively quick, with very little post operative cleaning – unlike water jet cutting, which can take as long as 10 days to 'mop-up'. Thus, the method effectively reduces overall plant down time and is very environmentally friendly.
Destec, has continued with development of the technique and equipment, and in 2006, with the number of projects carried out well into double figures. the company carried out a Regenerator Head removal at Fawley Refinery, UK. At 17m diameter, 22mm wall thickness and 125mm refractory lining thickness, this is the largest Destec has undertaken so far, and one of the largest undertaken anywhere in the world.
The dry cutting method developed by Destec is now readily available to use anywhere in the world and the growing number of satisfied customers who have benefited from this unique system extends from the UK and Europe through the Middle East.