Supreme Energy Efficiency For County Hall
01 August 2014
The recent £22m remodelling and refurbishment of the 1930’s civic building and 1970’s office extension for Wiltshire’s County Hall in Trowbridge was undertaken to consolidate the majority of Wiltshire Council’s 95 offices into four hubs, reducing floor area by 50%, saving £5m in revenue per annum, creating 40% reduction in carbon emissions and providing new flexible ways of working.
A major requirement of this development was to reduce the energy consumption by 40%. It is also just one of a few refurbishment projects within the UK on target for a BREEAM “excellent” rating, achieved by a complete building services overhaul together with improvements to the glazing and thermal upgrading of the walls and roof.The traditional single glazed sash windows were retained as an important architectural feature of the 1930’s building and secondary glazing was chosen as a way of dealing with both the heat loss through the glass and discomfort caused by drafts. Selectaglaze, the UK’s leading designer of secondary glazing systems, worked closely with main contractor Kier Western and Bristol-based architects Stride Treglown to develop appropriate designs. These needed to be engineered to meet the thermal requirements but also had to be as unobtrusive as possible. The solution for most windows was a matching balanced sash design that permits access to the existing window. Each frame is purpose made with high performance seals to reduce drafts and glazed with a low emissivity glass that markedly improves the thermal efficiency. Some of the windows were very large, up to 3.5M high and 1.6M wide, and a heavy duty frame from the Series 90 range was required to support the glass sizes. Smaller windows were treated with a slimmer frame from the Series 20 range.
The need to be unobtrusive was particularly important in the timber panelled Council Chamber, which has some of the largest windows. A single monumental hinged casement design was chosen as it permits an uninterrupted view through the windows. This was a big challenge as each casement weighs about 100Kg. The Series 50 range was specified with a bronze anodised finish to complement the panelling. It is fitted with very neat colour matched flush hinges and a concealed multi-point locking system that ensures a good seal and enhanced security.
More than 270 bespoke frames were fully fabricated off-site, allowing rapid installation to all four floors in phases to suit the contractors programme. The result is a more energy efficient and comfortable environment that is also much quieter.
Well-designed secondary glazing can play an important role in improving the environment of buildings of all styles but as a reversible adaptation it is particularly suited to listed and traditional buildings. Secondary glazing can achieve very significant noise insulation of 45dB or more, reduce the U-value of a window to around 1.8 and enhance security though the use of strengthened glass and locks. Systems are available that are accredited to Secured by Design.
Founded in 1966, Royal Warrant holder Selectaglaze has considerable experience of working within Listed and sensitive buildings. Products are fully tested and assessed for performance and twice yearly quality audits are conducted through the company’s ISO 9001 accreditation with LPCB. An extensive range of literature and guidance notes covering acoustics, thermal performance and added security is offered together with a technical advisory service and a RIBA approved CPD Seminar.
Other Press Releases By This Company
- 10/07/2014 - All quiet at St. Joseph's Catholic Primary School
- 20/06/2014 - Selectaglaze at the V&A
- 22/05/2014 - The Hallé Orchestra – Silenced by Selectaglaze!
- 15/05/2014 - Selectaglaze helps keep ‘Silence in the Library’
- 06/03/2014 - Selectaglaze on track
- 20/02/2014 - A Winning Performance in the “Golden Mile” – GREAT WEST HOUSE, BRENTFORD
- 18/02/2014 - A Feast For The Eyes
- 10/02/2014 - Selectaglaze - The sECOndary Glazing Specialist
- 07/02/2014 - Selectaglaze - The sECOndary Glazing Specialist
- 08/10/2013 - A Warmer Holme for Jordan’s Mills – Courtesy of Selectaglaze
- 23/09/2013 - English Heritage at the Engine House, Swindon - Selectaglaze Awarded Return Ticket
- 19/07/2013 - Stylish Secondary Glazing from Selectaglaze
- 29/05/2013 - Selectaglaze at The Coronation Festival, Buckingham Palace - 11th – 14th July 2013
- 17/05/2013 - University of Arts London – Student Accommodation at Camberwell Campus
- 30/04/2013 - CPD and Networking Opportunity
- 11/04/2013 - CPD At The Building Centre
- 19/02/2013 - Guidance literature for energy saving in Period Buildings
- 06/02/2013 - Selectaglaze at Radcliffe Infirmary
- 29/01/2013 - Contemporary Comfort in Listed Property
- 04/12/2012 - Making a Noise about Noise
- 15/11/2012 - Tate Liverpool
- 20/09/2012 - Selectaglaze Helps The Ages to Work Together
- 05/09/2012 - "Super Luxury" at Grosvenor House Apartments
- 23/07/2012 - CPD Update oF Selectaglaze's “Understanding and Specifying Secondary Glazing”
- 23/07/2012 - Selectaglaze assists with ground breaking housing scheme for disabled people
- 23/07/2012 - Selectaglaze Help put the "Green" in the UK-GBC
- 23/07/2012 - The silent treatment for award winning eco-friendly library