ENiGMA reduces Kings School heating costs by 58%
30 April 2009
The installation of the technically advanced ENiGMA descaling system has resulted in the school being able to reduce the use of the boiler in one of its boarding houses by a massive 62% in just two months.
Now clear of scale, the boiler is able to heat water from 46°c to 56°c in just two hours forty minutes compared to six hours twenty minutes preceding the installation of the ENiGMA system – saving 58% in energy costs.
Situated in an urban environment in the historic town of Canterbury in Kent, Kings' School was originally established in 597AD, making it Britains' oldest school. An independent co-educational day and boarding school, Kings' School caters for 769 pupils aged 12 to 18 years.
As Kent is situated in one of Britains' hardest water areas, with a hardness factor of around 508ppm, the school was badly affected by limescale, which built up in the pipelines and water-fed equipment. This resulted in poor temperature differentials between flow and return at the extremities of the circuit, scale in the bathrooms and kitchen and the boilers failing to heat water to set-point of the secondary thermostat.
An electromagnetic scale inhibitor was installed, when a new boarding house was built four years ago. However, when the calorifier was opened for inspection some months later it was found to be heavily scaled.
Looking for an alternative product that would not only extend the life of capital equipment but also reduce energy costs, the school decided to evaluate the ENiGMA Electronic Descaling System from Environmental Treatment Concepts (ETC).
To monitor performance of the system, ETC installed a data logger, which took temperature readings of the treated water every 15 minutes over a 3-month period. The raw data recorded, indicated that, prior to treatment, the boiler remained on constantly during the day because the water never heated sufficiently to operate the thermostat.
However, in just 2 months the heat exchanger efficiency increased because of descaling and the boiler now maintains temperatures correctly. Energy savings are obvious as the boiler now runs for 6.5 hours a day instead of 17.
Commenting, on the system, Gavin Merryweather, Domestic Bursar, said: “We are delighted with the ENiGMA descaling system and will be gradually installing it throughout the school as funds become available. Being in such a hard water area can result in the early renewal of capital equipment The system will not only help reduce energy bills but will also increases the life expectancy of items such as boilers, calorifiers and laundry equipment”.
Since the ENiGMA was installed on the calorifier, other units have been successfully fitted at other locations around the school. Kings' School is also considering installing the award winning ENiGMA Olympic unit on its swimming pools, which would dramatically reduce chemical usage, providing payback in just 18 months. In addition, savings can be achieved from not having to replace valves and bundles in the swimming pool heat exchangers.
Other Press Releases By This Company
- 11/02/2020 - Veteran Royal Navy engineers praised by MP for tech used to rid Type 45 destroyers and hospitals of limescale
- 24/09/2019 - Environmental Treatment Concepts
- 22/05/2017 - Nottingham Trent University gas water heaters
- 12/05/2017 - Maidstone prison hot water calorifier
- 27/03/2017 - Pingles leisure centre swimming pool conditioning
- 27/03/2017 - Queen Elizabeth Hospital Barbados
- 24/03/2017 - Lucas Power Systems Water Spray Booth
- 24/03/2017 - KNP Paper Mill - The Netherlands Water Treatment Plant
- 13/03/2017 - Controlling Legionella and Legionella Pneumophila in water systems
- 13/03/2017 - Cash Back for John Lewis through Energy Savings
- 10/03/2017 - Greek Poultry Farm Evaporative Cooling Panels
- 10/03/2017 - Goole Hospital Water System
- 20/02/2017 - Gallaher Steam Humidifiers
- 20/02/2017 - Fapajal paper - Portugal vacuum pumps
- 20/02/2017 - Leading Leisure Centre - Jersey, Channel Islands Swimming Pool Treatment
- 20/02/2017 - Eastney Health Centre - Portsmouth
- 14/02/2017 - Dutch poultry farm Bell Waterers/Nipple Drinkers
- 14/02/2017 - Dyped medical equipment - The Netherlands
- 14/02/2017 - David S Smith Packaging - Newmarket
- 14/02/2017 - Dairy Crest Milk Processing Plant - Evaporators
- 14/02/2017 - Cannon Rubber - Steam Boiler
- 13/02/2017 - Dairy Crest milk processing plant evaporators
- 13/02/2017 - Crowtree Leisure - Desuper Heat Exchanger
- 13/02/2017 - Chrysanthemum Nursery - Steam Boiler
- 13/02/2017 - CS Interglass - Water Cooled Rools
- 13/02/2017 - Commercial Union - Gas Boiler System
- 10/02/2017 - Courtaulds - Vapour Condenser
- 10/02/2017 - Residential Home Hartlepool - Laundry Equipment
- 10/02/2017 - Chassisjet - High Pressure Water Equipment
- 10/02/2017 - Calypso drinks - chilled water system
- 06/02/2017 - Britannia Airways - Hot Water Boiler
- 06/02/2017 - Buckland Paper Mill - Blowdown Vessel
- 06/02/2017 - Beatrix Gold Mine - South Africa
- 06/02/2017 - Baff Laundry - USA Boiler Water Services
- 31/01/2017 - Avonmore Meats Angelery & Steam Boiler
- 31/01/2017 - Avon Council Nursing Homes
- 31/01/2017 - Aspen Design Steam & Combination Ovens
- 31/01/2017 - Applegate Nurseries
- 31/01/2017 - Allington House Water System
- 28/11/2013 - ENiGMA - Chemical Free Struvite Deposit Control
- 17/10/2013 - Controlling Crustacean infestations in pipelines
- 08/10/2012 - ENiGMA benefits to Reverse Osmosis systems
- 08/10/2012 - Energy savings mean cash back for Waitrose
- 05/10/2012 - ETC ENiGMA success in Avon Council nursing homes
- 03/10/2012 - ETC ENiGMA improves nursery heating performance
- 02/10/2012 - ETC ENiGMA reduces limescale at Hampshire Hotel
- 19/09/2012 - Electronic Water Descaler makes a meal out of restaurant hard water
- 29/03/2012 - Maltby Colliery coalface equipment cooling
- 09/03/2011 - Does your boiler and fittings comply with sub-section 40 of the 1955 Factories Act?
- 25/11/2010 - ENiGMA cleans up at Portugal Copper Mine
- 10/09/2010 - ETC Enigmas keep watch over co-ed school
- 31/08/2010 - CRC promoting sustainability - the legacy of our time
- 30/12/2009 - Saving Energy and Water through effective Electronic Water Conditioning
- 07/12/2009 - ETC success through R&D
- 26/11/2009 - Effectiveness of ENiGMA testing
- 22/10/2009 - Hot water flows freely again at Chilworth Manor Hotel
- 15/10/2009 - Continuing John Lewis & ETC relationship to cut carbon footprint
- 05/08/2009 - Effective solution for Southern Water struvite problem
- 31/07/2009 - Going 'green' in the Algarve
- 29/06/2009 - Sustainability & hard water, or the missed opportunity to have a real impact on the S word
- 25/06/2009 - Contact Lens manufacturer makes clear decision on limescale prevention
- 15/05/2009 - Trusts under fire over refusal of limescale recognition
- 06/05/2009 - Hard water limescale is a major factor of end user increased energy costs
- 05/05/2009 - Project SLAM – Prevention is better than cure