Great Yarmouth's Herring Bridge Project
09 April 2024
In 2023, Althon supplied a number of precast concrete headwalls, to Great Yarmouth’s Third River Crossing (Herring Bridge).
All of these headwalls were made to order, and the majority of these were supplied with fitted accessories such as Kee Klamp Handrail, HDPE Non return Flap Valves, and Pond Liner Brackets at our customer’s request. One of the benefits of opting for pre fitted accessories, means there is less time spent on installation; saving valued time for contractors.We offer an impressive range of headwalls, flow control and flood prevention products to choose from and can deliver throughout the United Kingdom on our FORS registered lorries.
Other Press Releases By This Company
- 12/11/2024 - Flow control on headwalls 🌊
- 10/06/2024 - Circular Pipe Mounted Gratings
- 02/05/2024 - SFA Inlet and Outlet Headwalls
- 09/04/2024 - Eco 1 🍃
- 13/03/2024 - Reducing CO2e in our precast concrete headwalls
- 05/03/2024 - Bespoke Headwall
- 23/02/2024 - Large Headwalls
- 22/02/2024 - CHAS Certificate 2023/2024
- 12/02/2024 - Local headwalls in Norfolk
- 12/02/2024 - Coloured precast concrete headwalls
- 26/07/2022 - Level Invert on Headwalls
- 02/11/2021 - Approved Mammal Shelf to be used on HS2
- 13/11/2020 - Althon CPD course now available
- 14/10/2020 - Pre-fitted Manhole Chamber Accessories
- 08/06/2020 - Mammal Ledges & Shelves
- 04/06/2020 - Certified CPD Member
- 13/05/2020 - Anglian Water Approved Headwalls
- 09/03/2020 - Sewers for Adoption - range of Headwalls