Weiss Gallenkamp install major Plant Growth Research Facility
24 September 2007
This project was the design and build of new Headquarters and Laboratories of the Scottish Agricultural Science Agency (SASA).
Weiss Gallenkamp were asked to advise the architect and Services Consultants at a pre-tender stage as to the type of requirements a Controlled Environment would require.
The contract was to be awarded to a Main Contractor who was to choose and specify which main subcontractors would be used for the various specialist works. Five main contracting companies were approached and Weiss Gallenkamp were asked to tender for the Controlled Environment rooms by all five, so Weiss Gallenkamp pitched to all five to demonstrate our ability to provide a suitable solution to each.
Weiss Gallenkamp were contracted to supply the consultation, design and manufacture of controlled environment facilities, constituting the design, build and installation of 31 bespoke controlled environment rooms of 25 different types and 6 drying cabinets.
Forming a key element of the new Seeds and Laboratory Wing, Weiss Gallenkamp provided controlled environments for plant growth, seed storage, soil storage, nematode preparation and both long and short term storage for plant material.
Weiss Gallenkamp provided:
• Project management
• On-site installation management
• Commissioning
• Integration into local BMS and other facilities
• Installation
• Training of customer's own operating & service personnel
• Full user/client co-ordination
In order to ensure a smooth operation Weiss Gallenkamp had a full time Site Manager permanently on site from July 2005 through to completion and beyond, which contributed to the rooms being completed and accepted on time. As part of the services offered by Weiss Gallenkamp, post order advice was offered to the client to save energy costs in certain areas. This advice was accepted after Weiss Gallenkamp demonstrated the savings by providing supporting calculations.
Supporting documentation was then provided to prove the equipment specification, following testing and commissioning on site by Weiss Gallenkamp staff.
Types of rooms supplied include:
• Plant Growth rooms
• Multi-tier lit shelving tissue rooms
• Incubator rooms
• Cold store rooms
• Quarantine room for insects
• Freezer room (-20°C)
• Copenhagen tank room with temperature control
• Fixed and adjustable height shelving types
• Storage Rooms (long & short term) with library type mobile racking
• Soil drying cabinets
Completion of the project at SASA confirmed Weiss Gallenkamp's position as the leading provider of controlled environment technology to the scientific community and demonstrates our ability to work with major construction companies to deliver crucial specialist elements within broader projects.
Other Press Releases By This Company
- 16/09/2016 - Manchester Metropolitan University’s Cheshire Campus.
- 16/09/2016 - Aberystwyth University Announce 2016 Best SES Dissertation Winner
- 16/09/2016 - Weiss Technik UK win exciting new project at University of Sheffield!
- 21/06/2013 - Schunk Centennial Celebrations Begin at Rothamsted Research
- 20/05/2013 - Celebrating 100 Years of Schunk
- 09/01/2013 - Weiss Gallenkamp and Design Environmental Merger Announcement
- 09/10/2012 - 4th Controlled Environment User Group
- 19/09/2012 - Appointment of Regional Sales Manager in Germany
- 19/09/2012 - Successful Week for Weiss Gallenkamp at ACHEMA 2012
- 19/09/2012 - Climatic & Environmental Testing Seminars Receive a Positive Response
- 16/04/2010 - Detecting Invisible Danger - new Formaldehyde Chamber from Weiss Gallenkamp
- 15/04/2010 - Gallenkamp Ovens Relaunched
- 15/07/2009 - New Test Chambers for Lithium battery testing
- 12/01/2009 - Weiss Gallenkamp appointed exclusive Sales Agents
- 06/05/2008 - Weiss Gallenkamp supply most sophisticated Temperature and Vibration Chamber.
- 01/05/2008 - Weiss Gallenkamp supply leading manufacturer of brake products.
- 10/03/2008 - Weiss Gallenkamp launch new Solar Test Chambers
- 19/02/2008 - Syngenta Plant Growth Rooms
- 06/02/2008 - Weiss Gallenkamp install Syngenta Plant Growth Rooms
- 25/01/2008 - Volkswagen's new test facility.
- 07/11/2007 - Weiss Gallenkamp supply 14 'Mini' Test Chambers
- 16/10/2007 - Weiss Gallenkamp supply complete Pharmaceutical Stability solution.
- 16/10/2007 - Project SASA
- 05/10/2007 - Weiss Gallenkamp celebrate sale of200th Fingerprint Development Chamber.
- 04/10/2007 - Weiss Gallenkamp and Energy Efficiency
- 24/09/2007 - Weiss Gallenkamp supply latest technology to Airbus
- 24/09/2007 - Special Promotion from Weiss Gallenkamp
- 24/09/2007 - Weiss Gallenkamp launch new Environmental Test Chamber.