
23 May 2023 | IMC Glass
The Rabbit Hotel and Retreat
The former Templeton hotel has been going through a 10 million investment and refurbishment including a 2 million outdoor and spa area.
Set to open in June this year.Part of the glazing units that were installed was our Low-e energy saving products which will retain warmth inside the rooms.
Also being installed is our Fireglass range of units to ensure safety standards are met.