The no-nonsense guide to Lean Manufacturing terms
21 September 2018
Lean manufacturing principles and some of the tools that go with them can seem a bit daunting. All of the Japanese phrases, acronyms and occasionally bemusing maths often lead people to think that ‘lean’ might be great for large organisations but too much effort for what they do.
This is a real shame because it’s actually a lot more simple to understand and easier to implement than most people think.In this blog post we have listed a number of lean terms that you have probably come across (and perhaps run away from) and what they really mean when you cut out all the nonsense.
Mapping process - write down all the steps that happen when you do something.
Value stream mapping – from the above steps, work out what has to be done and adds value to the product (like building it), what has to be done but doesn’t add any value (like moving a product between production machines), and what is a complete waste of time and resources.
Reducing process waste - stop doing the stuff you don’t need to do.
5S – keep your work place tidy and organised. If it’s like a teenager’s bedroom then you’re not going to be efficient.
PDCA - Four logical steps to help improve a process. Plan (what’s the problem and what’s causing it?) Do (fix it) Check (is it fixed?) Act (adjust things if you need to). Following these simple steps just makes sure you do everything you need in a logical order with some structure.
DMAIC – Similar to PDCA, but with a bit more data, which is good! Define (what’s the problem?), Measure (how much of a problem is it?), Analyse (what’s causing the problem?), Improve (implement the solution), Control (check and keeping it going).
Gap analysis – where are we now and where do we want to be? The difference between these two questions is your gap and then you can think about how you are going to bridge it.
Visual management - make it clear to all staff what’s going on. Colourful graphics on monitors or noticeboards are good so that opportunities to improve are clear to everyone.
Practical Problem Solving – 5Y or ‘5 whys’ is a good approach that stops you jumping to incorrect conclusions by asking why to every answer you give. Small children are very good at this.
Kanban – a simple way of making sure you don’t run out of parts in production.
Total Preventative Maintenance (TPM) - maintain your equipment so it doesn’t break down and become useless.
Overall Equipment Effectiveness (OEE) - a number that tells you how much value you’re getting out of a piece of equipment. Warning, there is a bit of arithmetic here to calculate things but it’s worth it!
Line Balancing – this helps ensure you don’t have one person overloaded with work and the one next to them with almost nothing to do. Annoying for both parties and incredibly inefficient.
Just In Time (JIT) - don’t buy and make stuff until you need it.
PFMEA (Process Failure Mode Effect Analysis) – work out how a process might go wrong so you can stop it from happening before it does.
Poka Yoke – make it idiot proof. Think how you could make something go wrong then how you can stop it going wrong. It’s worth continuing to use the Japanese term though as it sounds funny and you’ll remember it.
Control plans – a checklist of what you’re going to do to check that everything is OK.
So there you go, lean manufacturing isn’t as scary as you thought after all and you’re probably doing a few of these already. But there are a lot of options and that in itself can be overwhelming so here’s a few ideas to really make it work for you:
Keep it practical. You don’t have to do all of it. If you’re new to lean then an overview course might be worthwhile so you can pick your favourite tools and make a start. For me, visual management, 5Y and Poka Yoke are really easy to implement and have shown brilliant results, whilst others run their working lives with DMAIC. Pick one and have a go!
Get everyone involved. In management speak, ‘embed it in your culture’. Lean isn’t all about your quality and production teams running special projects, it’s about helping everyone who is adding value to your product – which is usually the shop floor teams, and often they know best.
Every little helps. Even the smallest of improvements add up and embracing all ideas helps encourage everyone to join in. Really big, obvious changes are actually quite rare.
Continually look for improvements. Keep at it. You might not want to drive for the full ‘six sigma’ experience – 3.4 defects per million opportunities – which is near perfection, and your batch sizes and product variation might not even give you enough data to do this. But that variety will give you a lot of opportunities to improve, so stick at it. Those little changes might not look like much after a month or two, but could really make a difference after a year.
Design the process right in the first place. ‘Design for manufacture’ and a robust ‘New Product Introduction’ process really is worth the effort as it can avoid the big, expensive mistakes. Lean is then great at refining things.
Other Press Releases By This Company
- 26/07/2024 - The fall and rise of vertical farming companies
- 02/07/2024 - 7 ways agricultural drones are supporting precision farming
- 12/06/2024 - What are the pros and cons of India VS ASEAN for outsourced electronics manufacturing
- 06/06/2024 - How to ensure manufacturing precision in optical sensor technology
- 29/05/2024 - Why your EMS company needs a technology roadmap
- 09/04/2024 - The EU supply chain act is coming (eventually) are you ready?
- 21/03/2024 - Ultrasonic plastic welding: what is it and who needs it?
- 12/03/2024 - 10 ways that electronic components are changing modern tractors
- 29/02/2024 - 10 powerful reasons to manufacture electronics in Malaysia
- 06/02/2024 - Does AI boost efficiency in surface mount device production?
- 22/01/2024 - How strong is your Design & Development relationship?
- 05/01/2024 - Why 3D Optical Inspection should be standard in SMD-Production
- 07/11/2023 - A new era of outsourcing? Alternatives to traditional EMS outsourcing
- 24/10/2023 - ESCATEC Promotes Lambert Schutters to CPO to Redefine Procurement Strategy
- 09/10/2023 - The future of electronics manufacturing: a conversation with SmartRep's CEO
- 21/09/2023 - 4 crucial supply chain lessons for manufacturers revealed by Covid-19
- 15/08/2023 - 9 exciting travel technology companies revolutionising air travel
- 14/07/2023 - How OEMs can reduce Scope 1 and 2 emissions
- 04/07/2023 - What is thermal management and why should you care
- 22/06/2023 - What are the 6 steps of the Value Engineering Process for OEMs?
- 27/04/2023 - ESCATEC appoints new Chairman and Independent Director
- 27/03/2023 - ESCATEC doubles up on ESG activities
- 24/03/2023 - Turning up the volume: transforming cold chain logistics during Covid-19
- 14/03/2023 - ESCATEC to exhibit at the 2023 W3+ FAIR in Germany
- 27/01/2023 - Electronic component market review - January 2023
- 25/01/2023 - Keep data safe with robust cybersecurity and IS0 27001 certification
- 06/01/2023 - What is biometric security, and what exciting tech uses it?
- 12/12/2022 - The benefits of plastic injection moulding for electronic products
- 21/11/2022 - How to get your plastic injection moulding project right first time
- 17/10/2022 - Escatec invest in new "Innovation Hub" to support growing customer demand
- 22/09/2022 - Localisation and distributed manufacturing. Is the factory really coming home?
- 22/08/2022 - 16 exciting smart farming companies (finishing what Band Aid started)
- 05/05/2022 - JJS to ESCATEC: the past 12 months and the road ahead
- 22/04/2022 - Electronic component market review - April 2022
- 14/04/2022 - Five reasons why free issue materials could prove more costly than you think
- 31/03/2022 - From Dustbusters to GPS: technology from space exploration
- 28/03/2022 - Designing the perfect supply chain: is regionalisation the answer?
- 17/03/2022 - 7 reasons manufacturers are investing in robotics in 2022
- 14/03/2022 - Has the future of additive manufacturing just changed?
- 03/03/2022 - How the conflict in Ukraine is affecting the global supply chain
- 17/02/2022 - How retrofitting boosts the circular economy and improves efficiency
- 08/02/2022 - How the global supply chain crisis built closer OEM-EMS relationships
- 27/01/2022 - Electronic component market review - January 2022
- 20/01/2022 - Repeatable success: 8 steps of a sustainable new product development process
- 14/01/2022 - 4 Supply Chain Predictions for 2022
- 10/01/2022 - Value engineering: cutting supply chain costs not product quality
- 16/12/2021 - 7 keys to success in the new product development process
- 10/12/2021 - 5 cool things MEMS sensors are doing for you
- 02/12/2021 - Reconsidering your supply chain? How about Malaysia?
- 29/11/2021 - What is MEMS?
- 18/11/2021 - Women in manufacturing: how to build the companies of tomorrow
- 11/11/2021 - How VA/VE ‘follows the money’ to deliver more value to your customers
- 27/10/2021 - Electronic component market review - Oct 2021
- 21/10/2021 - Where have all the shipping containers gone?
- 18/10/2021 - UL certification for OEMs - what do you need to sell into the US?
- 30/09/2021 - Why outsourcing to an EMS provider can give OEMs a competitive advantage
- 23/09/2021 - Never outsourced before? The right EMS partner without the drama
- 20/09/2021 - When’s the right time to start a value engineering process?
- 10/09/2021 - Why you should sign a prenup with your electronics manufacturer
- 02/09/2021 - Being held hostage by your electronics manufacturer?
- 20/08/2021 - VA/VE: 7 tips for planning your manufacturing cost reduction strategy
- 13/08/2021 - Is industrial automation the future of the EMS factory floor?
- 05/08/2021 - Subcon 2021 is back: Here’s key information to help plan your visit
- 22/07/2021 - Manufacturing trade shows are back - and they are still worth visiting
- 15/07/2021 - Electronic component market review - July 2021
- 13/07/2021 - How to cut manufacturing costs without sacrificing quality
- 01/07/2021 - What are the 6 steps of the Value Engineering Process for OEMs?
- 24/06/2021 - The secrets to maintaining a healthy outsourcing relationship
- 16/06/2021 - Value Engineering for OEMs: 7 myths debunked!
- 14/06/2021 - What are the top digital trends for electronics manufacturing?
- 03/06/2021 - Volatility in the current metals market - June 2021
- 02/06/2021 - What are the pros and cons of reshoring UK electronics manufacturing?
- 20/05/2021 - The Ever Given & the future of supply chain management
- 18/05/2021 - JJS Manufacturing Acquired by ESCATEC
- 13/05/2021 - How to have effective virtual meetings with your EMS provider
- 05/05/2021 - Value Analysis and Value Engineering (VA/VE) explained for OEMs
- 30/04/2021 - Supply chain risk management in the wake of a crisis
- 22/04/2021 - Electronic component market review April 2021
- 15/04/2021 - Incoterms: why they matter for UK electronics manufacturing
- 08/04/2021 - Is component obsolescence in electronics manufacturing inevitable?
- 08/04/2021 - How to overcome 5 key challenges of electro-mechanical assembly
- 06/04/2021 - Getting a quote from an EMS provider. What could go wrong?
- 22/03/2021 - Supply chain management: Why over-forecasting is a bad idea
- 08/03/2021 - How Brexit is affecting the UK electronics manufacturing business
- 12/02/2021 - Fast, cheap or good? Feeling trapped by the iron triangle?
- 11/02/2021 - How long should your EMS provider take to prepare a quote?
- 08/02/2021 - You've chosen your EMS provider, now what?
- 05/02/2021 - 5 strategic priorities in your hunt for an EMS provider
- 21/01/2021 - When is the right time to speak to prospective EMS providers?
- 19/01/2021 - Can UK electronics manufacturers avert the global container crisis?
- 03/12/2020 - Is postponement manufacturing the best option in a post-Covid world?
- 27/11/2020 - The latest supply chain challenges to hit Electonics Manufacturing in 2020
- 13/11/2020 - Managing global manufacturing supply chains in a post-Covid world
- 11/11/2020 - Tackling the UK's manufacturing skills gap - why we must act now
- 10/11/2020 - What types of Service Level Agreement can you have with an EMS company?
- 14/10/2020 - Electronic component market review October 2020
- 13/10/2020 - 4 things to do before you speak to an EMS provider
- 12/10/2020 - What’s in an electro-mechanical build pack (& why you need one)
- 12/10/2020 - Levering the benefits of outsourced manufacturing & supply chain ownership
- 07/10/2020 - 4 ways highly flexible contract manufacturing supports innovation
- 16/09/2020 - Bells and whistles? Additive manufacturing for PCB designs
- 14/09/2020 - Can dual sourcing or multi sourcing beat supply chain uncertainty?
- 12/08/2020 - Is the manufacturing industry ready for Generation Z?
- 05/08/2020 - Small problems? 4 challenges & opportunities in PCB development
- 03/08/2020 - How will manufacturing immortality affect the product life cycle?
- 19/07/2020 - How much have attitudes shifted towards women in engineering?
- 03/07/2020 - Why outsourcing is a strategic decision
- 02/07/2020 - Robotic process automation in the manufacturing supply chain
- 12/06/2020 - How can manufacturers ensure business continuity?
- 04/06/2020 - Should UK manufacturers expect a nationwide reshoring initiative?
- 04/06/2020 - What the manufacturing environment might look like as a result of COVID-19 in the medium term manufacturing post-COVID
- 03/06/2020 - Why planning for failure is key to successful electronic assembly
- 03/06/2020 - My journey from university student to commercial graduate
- 14/05/2020 - How to withstand disruptive change in electronics manufacturing
- 28/04/2020 - 3 ways electronics manufacturing is combating the skills gap
- 27/04/2020 - Are virtual exhibitions the answer for UK electronics manufacturers?
- 27/04/2020 - Electronic component market review April 2020
- 06/04/2020 - 5 ways to combat cyber risk in UK electronics manufacturing
- 12/03/2020 - How is COVID-19 impacting the electronics manufacturing supply chain?
- 05/03/2020 - How can digital twinning benefit electronics manufacturing?
- 28/02/2020 - Which factors matter most in your PCB supplier selection strategy?
- 25/02/2020 - Three must-see Industry 4.0 events for UK electronics manufacturers
- 17/02/2020 - Securing an engineering placement - the final steps
- 07/02/2020 - What can electronics manufacturers gain from value engineering?
- 23/01/2020 - How can PCB design engineers combat raw material supply challenges?
- 17/01/2020 - Electronic component market review January 2020
- 03/01/2020 - Five ways to ace your engineering placement application
- 19/12/2019 - Gerber or ODB++ - which is best for your PCB fabrication?
- 16/12/2019 - What will your EMS partner expect to see in your build pack?
- 09/12/2019 - How digital tools can aid your postponement manufacturing strategy
- 25/11/2019 - 8 predictions for electronics manufacturing in 2020
- 14/11/2019 - What impact could CNY 2020 have on UK electronics manufacturing?
- 07/11/2019 - Is additive manufacturing the right choice for your electronic assembly?
- 04/11/2019 - What are 5 of the biggest threats to the electronics manufacturing supply chain?
- 24/10/2019 - Electronics manufacturing market review October 2019
- 18/10/2019 - Is the Smart Factory a realistic goal for UK electronics manufacturers?
- 14/10/2019 - Can SMEs overcome the seismic shifts in UK electronics manufacturing?
- 03/10/2019 - Why are rare earth elements so crucial for electronics manufacturing?
- 27/09/2019 - Is your EMS partner up to speed with WEEE 'Open Scope'?
- 23/09/2019 - How long will it take to address the UK engineering skills gap?
- 12/09/2019 - Combating ESD: the silent assassin in electronics manufacturing
- 04/09/2019 - The rising threat of social engineering for electronics manufacturers
- 22/08/2019 - Are you prepared for changes to the Conflict Minerals Regulation?
- 15/08/2019 - How can electronics manufacturers protect against cyber attacks?
- 13/08/2019 - The 7 steps to selecting a new EMS partner
- 07/08/2019 - Unit cost or total cost of supply: which matters most for UK OEMS?
- 26/07/2019 - How is the OEM/EMS partnership evolving in electronics manufacturing?
- 26/07/2019 - Could outsourcing your electronics manufacturing be the key to growth?
- 15/07/2019 - UK Electronics manufacturing 2019 - which markets are on the up?
- 05/07/2019 - Electronics manufacturing market review July 2019
- 28/06/2019 - Which test is best for your PCBA assembly - ICT or Flying Probe?
- 27/06/2019 - The 4 things every electronics manufacturer needs to know about test
- 19/06/2019 - Is digitalisation the key to the future of electronics manufacturing?
- 12/06/2019 - Is it worth keeping your electronics manufacturing in the UK?
- 30/05/2019 - What are the key questions to ask when auditing a new EMS partner?
- 23/05/2019 - 4 ways electronics manufacturers are growing their businesses in 2019
- 22/05/2019 - JJS Manufacturing returns to Subcon 2019
- 17/05/2019 - Looking to outsource to an EMS partner? Then don't miss Subcon 2019
- 09/05/2019 - What should a New Product Introduction (NPI) report look like?
- 03/05/2019 - What key questions should your EMS partner be asking in the supplier selection process?
- 29/04/2019 - How can electronics manufacturers reduce their environmental impact?
- 26/04/2019 - 8 predictions for UK electronics manufacturing in 2019
- 11/04/2019 - Electronic component market review - April 2019
- 10/04/2019 - Which IPC-A-610 class is best for your printed circuit board assembly?
- 04/04/2019 - Degree or apprenticeship – how I combined the best of both worlds
- 22/03/2019 - The hidden materials handling costs every OEM should be aware of
- 22/03/2019 - How to attract the best new electronics manufacturing talent
- 08/03/2019 - How can OEMs ensure quality supply chain management?
- 14/02/2019 - 4 ways to instantly improve the efficiency of your PCBA production
- 08/02/2019 - Industrial placements - is a sandwich year a good idea?
- 04/02/2019 - Careers for women in engineering - dispelling the myths
- 25/01/2019 - What to expect when you outsource your electronics manufacturing
- 25/01/2019 - Electronic component market review - January 2019
- 25/01/2019 - Southern Manufacturing and Electronics Exhibition
- 10/01/2019 - Six top tips to finding the right engineering degree
- 04/01/2019 - Can your EMS partner mitigate against out-of-the-box failures?
- 21/12/2018 - Three must-see UK electronics manufacturing trade shows for 2019
- 20/12/2018 - How to avoid supply chain disruption this Chinese New Year
- 20/12/2018 - Engineering placements: how to find the scheme that’s right for you
- 28/11/2018 - Manufacturers, just how effective is your induction process?
- 12/11/2018 - 4 questions OEMs typically ask when outsourcing
- 26/10/2018 - How to measure employee engagement within manufacturing
- 22/10/2018 - What to see and do at the 2018 National Graduate Recruitment Fair
- 17/10/2018 - What next - engineering apprenticeship or university degree?
- 15/10/2018 - Electronic component market review - October 2018
- 02/10/2018 - Annual EEF fact card shows solid growth for UK manufacturing
- 21/09/2018 - The Engineering Design Show 2018 - everything you need to know
- 18/09/2018 - What do SMT component shortages mean for design and manufacturing engineers
- 14/09/2018 - Looking under the hood of multi-layer ceramic capacitors (MLCCs)
- 06/09/2018 - Why ‘riding out’ the electronic components crisis is no longer an option
- 23/08/2018 - The impact of industry regulations on your manufacturing supply chain
- 20/08/2018 - How investment in staff wellbeing impacts manufacturing productivity
- 09/08/2018 - What’s driving the global demand for electronic components?
- 03/08/2018 - How engineering placements can address the UK manufacturing skills gap
- 23/07/2018 - How do manufacturers overcome growth challenges?
- 16/07/2018 - Is there an end in sight to the electronic components crisis?
- 10/07/2018 - Electronic component market review - July 2018
- 04/07/2018 - How a site visit can help you select the best electronics manufacturer
- 22/06/2018 - How to apply for a graduate scheme in manufacturing
- 24/05/2018 - How to secure a place on an electronics manufacturing graduate scheme
- 17/05/2018 - Plan your visit to the UK sub-contract manufacturing expo Subcon 2018
- 26/04/2018 - Industry 4.0 concerns
- 23/04/2018 - 5 ideas to enhance the induction process within manufacturing
- 16/04/2018 - How to assess top talent when recruiting for key manufacturing roles
- 11/04/2018 - Why Automated Optical Inspection is a must-have for PCB production
- 11/04/2018 - Have you got your outsourcing survival kit?
- 27/03/2018 - Are ineffective e-mails causing your manufacturing teams stress?
- 22/03/2018 - Drives & Controls 2018 - Tips to Planning Your Visit
- 27/02/2018 - The vital role of solder paste printing in New Product Introduction By Richard Barratt, 22 Feb, 2018
- 23/02/2018 - The Complete Guide to Outsourcing your Electronics Manufacturing
- 09/02/2018 - Should you outsource product design to an independent contractor?
- 22/01/2018 - simple ways to motivate your electronics manufacturing staff
- 22/01/2018 - Southern Manufacturing 2018: your eight-point guide to a great show
- 16/01/2018 - Is UK manufacturing ready for the fourth industrial revolution?
- 15/01/2018 - Why you want your EMS partner to be annoying and boring
- 08/01/2018 - How to select X-ray inspection equipment for electronics manufacturing
- 14/12/2017 - 9 ways to keep up with changes in manufacturing technology
- 05/12/2017 - Is your EMS provider “the one” for you?
- 17/11/2017 - Blockchain for manufacturing: what are the opportunities?
- 10/11/2017 - 5 simple elements to guarantee outsourcing success
- 03/11/2017 - What does an OEM really gain from outsourcing their manufacturing?
- 31/10/2017 - JJS to exhibit at Advanced Engineering 2017 1&2 November, NEC, Birmingham
- 24/10/2017 - Advanced Engineering 2017 - getting the most from your visit
- 24/10/2017 - Test solutions your EMS partner should offer
- 17/10/2017 - JJS to exhibit at the Engineering Design Show 2017
- 17/10/2017 - 8 factors a CEM should know about their suppliers
- 10/10/2017 - Current Market Conditions
- 10/10/2017 - Outsourcing Product Design
- 05/10/2017 - Engineering Design Show 2017 - planning your visit