Value Engineering for OEMs: 7 myths debunked!
16 June 2021
Value Engineering Value Analysis and Value Engineering (VA/VE) is a practice that’s often misunderstood and maligned by those who’ve seen projects bungled in the past. In this blog post, we bust some enduring myths about the Value Engineering process and what it can mean for an OEM business.
The hostility Value Engineering can provoke is legendary. A quick search of the blogosphere shows some robust criticisms of the practice from teams who have seen their products ‘value engineered’ before:“Value engineering means cheapening the job… there is no regard for value… it really should be called 'no value' engineering”
Engineers, protective of their products and reputation too often feel like VE is just an excuse to cut back on quality by blindly slashing materials and production costs.
Done right, though, VE is a hugely valuable tool that can bring every department of a business together as they find new ways of working to reinvigorate products and increase a company’s profitability.
Here’s the truth behind 7 common VE myths
Myth 1: VE is just about cost cutting
It’s true that when Value Engineering is an activity led only by procurement, it can be nothing short of a glorified and cavalier cost cutting exercise.
But if a business takes that approach to VE it’s almost bound to fail. The quality and satisfaction a product brings to your customers is integral to the fortunes of your company, after all. It’s the reason why they buy your product in the first place. Tinker with that at your peril. With this in mind, Value Engineering seeks to maintain and even increase the value of a product through uncovering and eliminating unnecessary costs arising in its design process and subsequent lifecycle.
The VE investigation process should ‘follow the money’ because it indicates where the potential for intelligent cost reductions lies - not because it shows up opportunities to ‘slash and burn’.
Myth 2: VE is just peer design review
Value engineering is not there to ‘pick holes’ or criticise work that has gone before. But it does acknowledge that design engineers don’t always have the time or remit to commercially optimise a product before it’s launched in the market place.
In some companies where engineers are both designing new products and working on existing product fixes and updates, there’s simply no time to spend time refining designs for manufacture. The presssure of tight time-lines often prevent busy teams from making the most competitive choices around materials and manufacturing processes before their products are launched.
In other companies with dedicated new product design teams, engineers are often deliberately focused on innovation and the next big thing - rather than the nitty-gritty of sourcing best value materials or the most efficient way to assemble parts once they’re on the production line.
Whatever the circumstances Value Engineering does not seek to criticise past decisions - only to enhance the value of a product for the business and the consumer in the future.
Myth 3: VE is about adding new product features
VE is not intended to increase the feature set of a product.
The objective of the process is not to work out what features products are missing. The tools and techniques that are used in the VE process focus on functions (what a product or component does for a customer) and then works out how those functions can be delivered most efficiently and effectively.
But VE can use tools like Function Analysis to separate features from functions - defining what a product or component does for a customer rather than 'how it does it'. This liberates engineers to think more imaginatively about the same functions can be served in more cost-effective ways.
Some Value Engineers deploy other creative thinking techniques such as SCAMPER checklists (working what could be Substituted, Combined, Adapted, Modified, Put to another use, Eliminated, or Reversed in a design) to completely reimagine how a product answers market needs and provides value to a consumer.
This kind of process may conclude that new features could answer the same customer needs in a more cost-effective way, but any recommendations will be assessed and analysed as part of the formal VE process. If the recommendations reduce costs while increasing value to customers they may well be taken up as part of the formal VE plan going forward.
Myth 4: VE is a glorified LEAN project
VE is not LEAN by another name. Although LEAN thinking and 6 Sigma are tools which can and should be applied in a VE project, those disciplines are just focused on delivering efficiencies in the design and production phases of manufacture. VE needs to be much more holistic in its approach to achieve its objectives.
Myth 5: Value Engineering is a job for a single department
The VE process is not about a single department or consultant looking at spreadsheets and deciding what changes should be made to a product. It’s about a whole team of individuals with different experience and expertise in the product, working together. These multi-skilled VE teams work in a highly disciplined and ordered way to deliver insight, recommendations and a plan to re-engineer a product to improve its value.
By involving everyone from procurement and design, to manufacture, delivery and logistics the team can first isolate ALL of the costs involved in every stage of a products’ realisation and distribution. Then they can use their expertise to rethink the way each part of this process could be delivered to eliminate unnecessary costs and keep a product competitive. VE is about joining the dots and losing the silos, pin-pointing the changes that will make the most impact on your bottom line in the long term.
Myth 6: Value Engineering is only interested in changing the physical product
Once VA/VE was centred around eliminating unnecessary costs contained in the physical product itself. Now we're in a globalised economy driven by digital innovation and JIT economics the challenges are different. We're highly sensitive to turbulence and dependent on trends in international markets. Waste and unnecessary costs can be hidden deep in complex supply chains or the design and procurement decisions taken years ago.
It may be a long time since your product was designed and examined for profitability and efficiency of production. Market conditions could have changed and thrown costs way out of kilter. Maybe Covid has exposed vulnerabilities and introduced new financial burdens within your supply chain. Maybe Brexit has made importing and moving goods between factories in the UK and Europe prohibitively expensive. Maybe there are new manufacturing processes the latest AI tech has made available that could be delivering new cost savings to your business.
That’s why the initial VE investigation isolating costs across the entire product lifecycle is so important.
Value Engineering ‘follows the money’ throughout every part of your design, manufacturing and delivery process to uncover new possibilities for intelligent cost reduction where ever they may lie.
Myth 7: Value Engineering can only happen at the end of project
Can you only Value Engineer a product after it’s been launched and is in production? Retrospective Value Engineering may be vital when a product is floundering under new commercial pressures and you need to urgently increase its value and relevance to customers. But VE can and should be applied as early as possible in the product lifecycle to analyse and optimise your design and manufacturing decision making. As 80% of a product's costs are fixed in the design phase this is a critical time to concentrate on making the smart substitutions of materials, components and processes that will maximise profitability and give you a competitive edge from the start.
Conclusion
Done right, Value Engineering is a systematic process of investigation, analysis and recommendation for intelligent cost reduction that will drive value for your customers and increase your profitability. But it's easy to be daunted by the challenge or put off by negative experiences of poorly executed projects in the past.
For the VE process to be successful it's got to be disciplined and focused, with clear objectives and an agreed way of implementing the recommendations you come up with.
If VE is going to bring enduring benefits to your whole business it needs to become a routine part of the 'way you work'; a defined methodology that you can repeat over again to drive efficiencies and quality at the same time.
Other Press Releases By This Company
- 26/07/2024 - The fall and rise of vertical farming companies
- 02/07/2024 - 7 ways agricultural drones are supporting precision farming
- 12/06/2024 - What are the pros and cons of India VS ASEAN for outsourced electronics manufacturing
- 06/06/2024 - How to ensure manufacturing precision in optical sensor technology
- 29/05/2024 - Why your EMS company needs a technology roadmap
- 09/04/2024 - The EU supply chain act is coming (eventually) are you ready?
- 21/03/2024 - Ultrasonic plastic welding: what is it and who needs it?
- 12/03/2024 - 10 ways that electronic components are changing modern tractors
- 29/02/2024 - 10 powerful reasons to manufacture electronics in Malaysia
- 06/02/2024 - Does AI boost efficiency in surface mount device production?
- 22/01/2024 - How strong is your Design & Development relationship?
- 05/01/2024 - Why 3D Optical Inspection should be standard in SMD-Production
- 07/11/2023 - A new era of outsourcing? Alternatives to traditional EMS outsourcing
- 24/10/2023 - ESCATEC Promotes Lambert Schutters to CPO to Redefine Procurement Strategy
- 09/10/2023 - The future of electronics manufacturing: a conversation with SmartRep's CEO
- 21/09/2023 - 4 crucial supply chain lessons for manufacturers revealed by Covid-19
- 15/08/2023 - 9 exciting travel technology companies revolutionising air travel
- 14/07/2023 - How OEMs can reduce Scope 1 and 2 emissions
- 04/07/2023 - What is thermal management and why should you care
- 22/06/2023 - What are the 6 steps of the Value Engineering Process for OEMs?
- 27/04/2023 - ESCATEC appoints new Chairman and Independent Director
- 27/03/2023 - ESCATEC doubles up on ESG activities
- 24/03/2023 - Turning up the volume: transforming cold chain logistics during Covid-19
- 14/03/2023 - ESCATEC to exhibit at the 2023 W3+ FAIR in Germany
- 27/01/2023 - Electronic component market review - January 2023
- 25/01/2023 - Keep data safe with robust cybersecurity and IS0 27001 certification
- 06/01/2023 - What is biometric security, and what exciting tech uses it?
- 12/12/2022 - The benefits of plastic injection moulding for electronic products
- 21/11/2022 - How to get your plastic injection moulding project right first time
- 17/10/2022 - Escatec invest in new "Innovation Hub" to support growing customer demand
- 22/09/2022 - Localisation and distributed manufacturing. Is the factory really coming home?
- 22/08/2022 - 16 exciting smart farming companies (finishing what Band Aid started)
- 05/05/2022 - JJS to ESCATEC: the past 12 months and the road ahead
- 22/04/2022 - Electronic component market review - April 2022
- 14/04/2022 - Five reasons why free issue materials could prove more costly than you think
- 31/03/2022 - From Dustbusters to GPS: technology from space exploration
- 28/03/2022 - Designing the perfect supply chain: is regionalisation the answer?
- 17/03/2022 - 7 reasons manufacturers are investing in robotics in 2022
- 14/03/2022 - Has the future of additive manufacturing just changed?
- 03/03/2022 - How the conflict in Ukraine is affecting the global supply chain
- 17/02/2022 - How retrofitting boosts the circular economy and improves efficiency
- 08/02/2022 - How the global supply chain crisis built closer OEM-EMS relationships
- 27/01/2022 - Electronic component market review - January 2022
- 20/01/2022 - Repeatable success: 8 steps of a sustainable new product development process
- 14/01/2022 - 4 Supply Chain Predictions for 2022
- 10/01/2022 - Value engineering: cutting supply chain costs not product quality
- 16/12/2021 - 7 keys to success in the new product development process
- 10/12/2021 - 5 cool things MEMS sensors are doing for you
- 02/12/2021 - Reconsidering your supply chain? How about Malaysia?
- 29/11/2021 - What is MEMS?
- 18/11/2021 - Women in manufacturing: how to build the companies of tomorrow
- 11/11/2021 - How VA/VE ‘follows the money’ to deliver more value to your customers
- 27/10/2021 - Electronic component market review - Oct 2021
- 21/10/2021 - Where have all the shipping containers gone?
- 18/10/2021 - UL certification for OEMs - what do you need to sell into the US?
- 30/09/2021 - Why outsourcing to an EMS provider can give OEMs a competitive advantage
- 23/09/2021 - Never outsourced before? The right EMS partner without the drama
- 20/09/2021 - When’s the right time to start a value engineering process?
- 10/09/2021 - Why you should sign a prenup with your electronics manufacturer
- 02/09/2021 - Being held hostage by your electronics manufacturer?
- 20/08/2021 - VA/VE: 7 tips for planning your manufacturing cost reduction strategy
- 13/08/2021 - Is industrial automation the future of the EMS factory floor?
- 05/08/2021 - Subcon 2021 is back: Here’s key information to help plan your visit
- 22/07/2021 - Manufacturing trade shows are back - and they are still worth visiting
- 15/07/2021 - Electronic component market review - July 2021
- 13/07/2021 - How to cut manufacturing costs without sacrificing quality
- 01/07/2021 - What are the 6 steps of the Value Engineering Process for OEMs?
- 24/06/2021 - The secrets to maintaining a healthy outsourcing relationship
- 14/06/2021 - What are the top digital trends for electronics manufacturing?
- 03/06/2021 - Volatility in the current metals market - June 2021
- 02/06/2021 - What are the pros and cons of reshoring UK electronics manufacturing?
- 20/05/2021 - The Ever Given & the future of supply chain management
- 18/05/2021 - JJS Manufacturing Acquired by ESCATEC
- 13/05/2021 - How to have effective virtual meetings with your EMS provider
- 05/05/2021 - Value Analysis and Value Engineering (VA/VE) explained for OEMs
- 30/04/2021 - Supply chain risk management in the wake of a crisis
- 22/04/2021 - Electronic component market review April 2021
- 15/04/2021 - Incoterms: why they matter for UK electronics manufacturing
- 08/04/2021 - Is component obsolescence in electronics manufacturing inevitable?
- 08/04/2021 - How to overcome 5 key challenges of electro-mechanical assembly
- 06/04/2021 - Getting a quote from an EMS provider. What could go wrong?
- 22/03/2021 - Supply chain management: Why over-forecasting is a bad idea
- 08/03/2021 - How Brexit is affecting the UK electronics manufacturing business
- 12/02/2021 - Fast, cheap or good? Feeling trapped by the iron triangle?
- 11/02/2021 - How long should your EMS provider take to prepare a quote?
- 08/02/2021 - You've chosen your EMS provider, now what?
- 05/02/2021 - 5 strategic priorities in your hunt for an EMS provider
- 21/01/2021 - When is the right time to speak to prospective EMS providers?
- 19/01/2021 - Can UK electronics manufacturers avert the global container crisis?
- 03/12/2020 - Is postponement manufacturing the best option in a post-Covid world?
- 27/11/2020 - The latest supply chain challenges to hit Electonics Manufacturing in 2020
- 13/11/2020 - Managing global manufacturing supply chains in a post-Covid world
- 11/11/2020 - Tackling the UK's manufacturing skills gap - why we must act now
- 10/11/2020 - What types of Service Level Agreement can you have with an EMS company?
- 14/10/2020 - Electronic component market review October 2020
- 13/10/2020 - 4 things to do before you speak to an EMS provider
- 12/10/2020 - What’s in an electro-mechanical build pack (& why you need one)
- 12/10/2020 - Levering the benefits of outsourced manufacturing & supply chain ownership
- 07/10/2020 - 4 ways highly flexible contract manufacturing supports innovation
- 16/09/2020 - Bells and whistles? Additive manufacturing for PCB designs
- 14/09/2020 - Can dual sourcing or multi sourcing beat supply chain uncertainty?
- 12/08/2020 - Is the manufacturing industry ready for Generation Z?
- 05/08/2020 - Small problems? 4 challenges & opportunities in PCB development
- 03/08/2020 - How will manufacturing immortality affect the product life cycle?
- 19/07/2020 - How much have attitudes shifted towards women in engineering?
- 03/07/2020 - Why outsourcing is a strategic decision
- 02/07/2020 - Robotic process automation in the manufacturing supply chain
- 12/06/2020 - How can manufacturers ensure business continuity?
- 04/06/2020 - Should UK manufacturers expect a nationwide reshoring initiative?
- 04/06/2020 - What the manufacturing environment might look like as a result of COVID-19 in the medium term manufacturing post-COVID
- 03/06/2020 - Why planning for failure is key to successful electronic assembly
- 03/06/2020 - My journey from university student to commercial graduate
- 14/05/2020 - How to withstand disruptive change in electronics manufacturing
- 28/04/2020 - 3 ways electronics manufacturing is combating the skills gap
- 27/04/2020 - Are virtual exhibitions the answer for UK electronics manufacturers?
- 27/04/2020 - Electronic component market review April 2020
- 06/04/2020 - 5 ways to combat cyber risk in UK electronics manufacturing
- 12/03/2020 - How is COVID-19 impacting the electronics manufacturing supply chain?
- 05/03/2020 - How can digital twinning benefit electronics manufacturing?
- 28/02/2020 - Which factors matter most in your PCB supplier selection strategy?
- 25/02/2020 - Three must-see Industry 4.0 events for UK electronics manufacturers
- 17/02/2020 - Securing an engineering placement - the final steps
- 07/02/2020 - What can electronics manufacturers gain from value engineering?
- 23/01/2020 - How can PCB design engineers combat raw material supply challenges?
- 17/01/2020 - Electronic component market review January 2020
- 03/01/2020 - Five ways to ace your engineering placement application
- 19/12/2019 - Gerber or ODB++ - which is best for your PCB fabrication?
- 16/12/2019 - What will your EMS partner expect to see in your build pack?
- 09/12/2019 - How digital tools can aid your postponement manufacturing strategy
- 25/11/2019 - 8 predictions for electronics manufacturing in 2020
- 14/11/2019 - What impact could CNY 2020 have on UK electronics manufacturing?
- 07/11/2019 - Is additive manufacturing the right choice for your electronic assembly?
- 04/11/2019 - What are 5 of the biggest threats to the electronics manufacturing supply chain?
- 24/10/2019 - Electronics manufacturing market review October 2019
- 18/10/2019 - Is the Smart Factory a realistic goal for UK electronics manufacturers?
- 14/10/2019 - Can SMEs overcome the seismic shifts in UK electronics manufacturing?
- 03/10/2019 - Why are rare earth elements so crucial for electronics manufacturing?
- 27/09/2019 - Is your EMS partner up to speed with WEEE 'Open Scope'?
- 23/09/2019 - How long will it take to address the UK engineering skills gap?
- 12/09/2019 - Combating ESD: the silent assassin in electronics manufacturing
- 04/09/2019 - The rising threat of social engineering for electronics manufacturers
- 22/08/2019 - Are you prepared for changes to the Conflict Minerals Regulation?
- 15/08/2019 - How can electronics manufacturers protect against cyber attacks?
- 13/08/2019 - The 7 steps to selecting a new EMS partner
- 07/08/2019 - Unit cost or total cost of supply: which matters most for UK OEMS?
- 26/07/2019 - How is the OEM/EMS partnership evolving in electronics manufacturing?
- 26/07/2019 - Could outsourcing your electronics manufacturing be the key to growth?
- 15/07/2019 - UK Electronics manufacturing 2019 - which markets are on the up?
- 05/07/2019 - Electronics manufacturing market review July 2019
- 28/06/2019 - Which test is best for your PCBA assembly - ICT or Flying Probe?
- 27/06/2019 - The 4 things every electronics manufacturer needs to know about test
- 19/06/2019 - Is digitalisation the key to the future of electronics manufacturing?
- 12/06/2019 - Is it worth keeping your electronics manufacturing in the UK?
- 30/05/2019 - What are the key questions to ask when auditing a new EMS partner?
- 23/05/2019 - 4 ways electronics manufacturers are growing their businesses in 2019
- 22/05/2019 - JJS Manufacturing returns to Subcon 2019
- 17/05/2019 - Looking to outsource to an EMS partner? Then don't miss Subcon 2019
- 09/05/2019 - What should a New Product Introduction (NPI) report look like?
- 03/05/2019 - What key questions should your EMS partner be asking in the supplier selection process?
- 29/04/2019 - How can electronics manufacturers reduce their environmental impact?
- 26/04/2019 - 8 predictions for UK electronics manufacturing in 2019
- 11/04/2019 - Electronic component market review - April 2019
- 10/04/2019 - Which IPC-A-610 class is best for your printed circuit board assembly?
- 04/04/2019 - Degree or apprenticeship – how I combined the best of both worlds
- 22/03/2019 - The hidden materials handling costs every OEM should be aware of
- 22/03/2019 - How to attract the best new electronics manufacturing talent
- 08/03/2019 - How can OEMs ensure quality supply chain management?
- 14/02/2019 - 4 ways to instantly improve the efficiency of your PCBA production
- 08/02/2019 - Industrial placements - is a sandwich year a good idea?
- 04/02/2019 - Careers for women in engineering - dispelling the myths
- 25/01/2019 - What to expect when you outsource your electronics manufacturing
- 25/01/2019 - Electronic component market review - January 2019
- 25/01/2019 - Southern Manufacturing and Electronics Exhibition
- 10/01/2019 - Six top tips to finding the right engineering degree
- 04/01/2019 - Can your EMS partner mitigate against out-of-the-box failures?
- 21/12/2018 - Three must-see UK electronics manufacturing trade shows for 2019
- 20/12/2018 - How to avoid supply chain disruption this Chinese New Year
- 20/12/2018 - Engineering placements: how to find the scheme that’s right for you
- 28/11/2018 - Manufacturers, just how effective is your induction process?
- 12/11/2018 - 4 questions OEMs typically ask when outsourcing
- 26/10/2018 - How to measure employee engagement within manufacturing
- 22/10/2018 - What to see and do at the 2018 National Graduate Recruitment Fair
- 17/10/2018 - What next - engineering apprenticeship or university degree?
- 15/10/2018 - Electronic component market review - October 2018
- 02/10/2018 - Annual EEF fact card shows solid growth for UK manufacturing
- 21/09/2018 - The Engineering Design Show 2018 - everything you need to know
- 21/09/2018 - The no-nonsense guide to Lean Manufacturing terms
- 18/09/2018 - What do SMT component shortages mean for design and manufacturing engineers
- 14/09/2018 - Looking under the hood of multi-layer ceramic capacitors (MLCCs)
- 06/09/2018 - Why ‘riding out’ the electronic components crisis is no longer an option
- 23/08/2018 - The impact of industry regulations on your manufacturing supply chain
- 20/08/2018 - How investment in staff wellbeing impacts manufacturing productivity
- 09/08/2018 - What’s driving the global demand for electronic components?
- 03/08/2018 - How engineering placements can address the UK manufacturing skills gap
- 23/07/2018 - How do manufacturers overcome growth challenges?
- 16/07/2018 - Is there an end in sight to the electronic components crisis?
- 10/07/2018 - Electronic component market review - July 2018
- 04/07/2018 - How a site visit can help you select the best electronics manufacturer
- 22/06/2018 - How to apply for a graduate scheme in manufacturing
- 24/05/2018 - How to secure a place on an electronics manufacturing graduate scheme
- 17/05/2018 - Plan your visit to the UK sub-contract manufacturing expo Subcon 2018
- 26/04/2018 - Industry 4.0 concerns
- 23/04/2018 - 5 ideas to enhance the induction process within manufacturing
- 16/04/2018 - How to assess top talent when recruiting for key manufacturing roles
- 11/04/2018 - Why Automated Optical Inspection is a must-have for PCB production
- 11/04/2018 - Have you got your outsourcing survival kit?
- 27/03/2018 - Are ineffective e-mails causing your manufacturing teams stress?
- 22/03/2018 - Drives & Controls 2018 - Tips to Planning Your Visit
- 27/02/2018 - The vital role of solder paste printing in New Product Introduction By Richard Barratt, 22 Feb, 2018
- 23/02/2018 - The Complete Guide to Outsourcing your Electronics Manufacturing
- 09/02/2018 - Should you outsource product design to an independent contractor?
- 22/01/2018 - simple ways to motivate your electronics manufacturing staff
- 22/01/2018 - Southern Manufacturing 2018: your eight-point guide to a great show
- 16/01/2018 - Is UK manufacturing ready for the fourth industrial revolution?
- 15/01/2018 - Why you want your EMS partner to be annoying and boring
- 08/01/2018 - How to select X-ray inspection equipment for electronics manufacturing
- 14/12/2017 - 9 ways to keep up with changes in manufacturing technology
- 05/12/2017 - Is your EMS provider “the one” for you?
- 17/11/2017 - Blockchain for manufacturing: what are the opportunities?
- 10/11/2017 - 5 simple elements to guarantee outsourcing success
- 03/11/2017 - What does an OEM really gain from outsourcing their manufacturing?
- 31/10/2017 - JJS to exhibit at Advanced Engineering 2017 1&2 November, NEC, Birmingham
- 24/10/2017 - Advanced Engineering 2017 - getting the most from your visit
- 24/10/2017 - Test solutions your EMS partner should offer
- 17/10/2017 - JJS to exhibit at the Engineering Design Show 2017
- 17/10/2017 - 8 factors a CEM should know about their suppliers
- 10/10/2017 - Current Market Conditions
- 10/10/2017 - Outsourcing Product Design
- 05/10/2017 - Engineering Design Show 2017 - planning your visit