FlexiDry Fast Drying Floor Screed Installation Completed at The Lancasters
08 March 2011
In February the final apartment was screeded with FlexiDry fast drying floor screed at The Lancasters, a development of 77 luxury apartments with stunning views over London's Hyde Park.
Over 16,000 sq metres of FlexiDry F1 – 7 day dry screed - has been installed over the last 14 months in the apartments constructed behind the listed facade of the former Lancaster Gate Thistle Hotel.It's full circle for the buildings, originally built as 15 houses before their subsequent conversion to a hotel. The French Renaissance-style terrace, on the north side of Hyde Park, has 270 windows facing the park. The architects spent more than a year underpinning the original façade – which, at 124m, is the longest in Europe – with 500 tonnes of steel supports.
Behind the historic exterior lie thoroughly modern interiors, complete with the latest underfloor heating systems, include original cornices which had been excavated from the site and used to decorate pillars, and feature fire places in all reception rooms.
Final floor finishes in the apartments include walnut timber flooring in the reception areas and master bedrooms; marble tiles with contrasting inserts in the entrance halls; and grey stone porcelain tiles in the kitchen/utility areas.
The residencies range from a one bedroom studio apartments of the ground floor of approximately 640 sq ft to the four bedroom duplex penthouses which are located on the 4th and 5th floors which offer 3,800 sq ft of accommodation and exceptional southerly views over Hyde Park and across the London skyline.
The Lancasters features a Cote d'Azur style garden; a fully-equipped gymnasium available to all residents with a luxurious spa, 15m x 4m swimming pool, steam room and treatment room; and basement parking via the grand carriageway entrance.
FlexiDry fast drying floor screed was chosen for the project due to its ability to be laid at thinner depths, saving material costs, and its reliable dry times which are not dependant on a controlled temperature of 20 Deg C & 50% RH, removing the need for expensive liquid DPM’s.
Other Press Releases By This Company
- 05/04/2012 - Cost effective, quick and efficient: Flexidry floor screeds won the bid as the screed choice for Blackfriars Station
- 20/03/2012 - Greener turf for the Athletes Village with FlexiDry sustainable screeds
- 20/02/2012 - FlexiDry provides energy efficient screed for Romford’s zero-carbon Youth Centre
- 05/01/2012 - Trendy New Futures Centre to replace the old Banbury Youth Centre
- 01/12/2011 - FlexiDry floor screed delivers exceptional drying time unhindered by low winter temperatures
- 03/11/2011 - Floor Screed for luxury green home-‘ The Bluff’, Chinnoror
- 15/08/2011 - Wexham Court Primary school to be a landmark in sustainable construction
- 12/07/2011 - FlexiDry Floor Screeds go by their word of quick drying time and quality- reveals Customer Survey Report
- 27/06/2011 - FlexiDry for Ashleigh Infant school, Wymondham
- 12/05/2011 - FlexiDry for Mivan Depa’s maiden project for the UK
- 18/04/2011 - FlexiDry offers the perfect screeding solution for Rivergate School, Barking
- 18/04/2011 - FlexiDry enhancing energy efficiency for ModernaHus, the new green housing solution for the UK
- 25/03/2011 - The Importance of Moisture Testing Floor Screed
- 26/07/2010 - FlexiDry Global Ltd launches its latest fast drying floor screed
- 26/07/2010 - Expanding Christian centre uses FlexiDry to ensure progress
- 24/05/2010 - How to Achieve Best Results With Floor Screed
- 17/05/2010 - FlexiDry helps train the next generation of screeders
- 05/05/2010 - A second phase for FlexiDry at the Greenpower Centre